Introduction
  • ENR Upgrade and Expansion of the Region II Wastewater Treatment Plant
  • Gravity Sewer Collection System Improvements in the St. Michaels Area
  • Separate Environmental Project – Establishment of decentralized sanctuaries for aquatic species
  • Pilot of the On-Site Sewage Disposal System Management Strategy
  • Issues to consider – open discussion
3
Goals
  • Improve the Water Quality of the effluent being discharged from the Region II Wastewater Treatment Plant; and
  • Eliminate sanitary sewer overflows and surcharging conditions of the gravity sewer system; and
  • Reduce extraneous flows, typically referred to as Inflow and Infiltration (I&I) entering the gravity sewer system.
4
 
5
Benefits of Proposed BNR Project
6
Region II Wastewater Treatment Plant Costs

    • Allocated ENR/BNR Grant Funding: $  4,718,578
    • SRF Loan Amount: $  8,317,699
    • Total Design and Construction Cost: $ 13,036,277


7
 
8
General Construction
9
 
10
Region II Wastewater Treatment System Overall Costs

    • Allocated ENR/BNR Grant Funding: $  4,718,578
    • SRF Loan Amount: $  8,317,699
    • Total Design and Construction Cost: $ 13,036,277


    • Pump Station Upgrades:
      • Grant Funding: $   500,000
      • State Revolving Funds for Loans: $1,183,732
    • Force Main:
      • Grant Funding: $    500,000
      • State Revolving Funds for Loans: $    810,450
    • Community of Rio Vista and Sections of St. Michaels Gravity Sewer Collection System Cleaning, TV Inspection, Joint Testing and Pressure Grouting – Sanitary District Funds
      • Total Cost (Complete by February, 2006): $   229,178
    • Manhole Rehabilitation and Slip Lining: $   650,000
    • Sewer Replacements: $ 2,000,000
    • Additional Slip Lining: $   750,000


    • TOTAL COSTS: $19,658,637